Skip to content
Back to skills

Structured Dev Cycle

ASecurity

6-stage structured development cycle with stage-based tool restrictions

  • 43 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added September 9, 2026
testingbashtestingsecuritydocumentation

Works with

  • claude code

Security analysis

A100/100

Scanned September 9, 2026

npx -y skills add baekenough/oh-my-customcode --skill structured-dev-cycle --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Structured Dev Cycle?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Structured Dev Cycle
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/baekenough-structured-dev-cycle/badge)](https://www.skillsdirectory.com/skills/baekenough-structured-dev-cycle)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: structured-dev-cycle
description: 6-stage structured development cycle with stage-based tool restrictions
scope: core
version: 1.0.0
user-invocable: true
---

# Structured Development Cycle

A disciplined 6-stage development cycle that enforces quality through stage-based tool restrictions. Prevents premature implementation by requiring planning and verification phases.

## Background

Inspired by Pi Coding Agent Workflow Extension's structured development approach. The core insight: restricting file modification tools during planning phases forces thorough analysis before code changes.

## Stages

| # | Stage | Allowed Tools | Blocked Tools | Purpose |
|---|-------|---------------|---------------|---------|
| 1 | **Plan** | Read, Glob, Grep, WebSearch, WebFetch | Write, Edit, Bash (modifying) | Define approach, analyze requirements |
| 2 | **Verify Plan** | Read, Glob, Grep | Write, Edit, Bash | Review plan from different perspective |
| 3 | **Implement** | All tools | None | Write code, create files |
| 4 | **Verify Implementation** | Read, Glob, Grep, Bash (tests only) | Write, Edit | Review code, run tests |
| 5 | **Compound** | Read, Bash (tests only) | Write, Edit | Integration testing, cross-module validation |
| 6 | **Done** | Read | Write, Edit, Bash | Summary and documentation |

### Stage Model Recommendations

Following the [reasoning-sandwich](/skills/reasoning-sandwich) pattern:

| Stage | Recommended Model | Rationale |
|-------|------------------|-----------|
| 1: Plan | opus | Architectural reasoning, requirement analysis |
| 2: Verify Plan | opus | Edge case detection, alternative evaluation |
| 3: Implement | sonnet | Code generation, file creation optimized |
| 4: Verify Implementation | sonnet | Test execution, structural review |
| 5: Compound | sonnet | Integration testing, cross-module validation |
| 6: Done | haiku | Checklist validation, summary generation |

Model selection is advisory — the orchestrator may override based on task complexity.

## Stage Tracking

Stage state is tracked via a marker file for hook enforcement:

```bash
# Set stage (used by orchestrator or skill)
echo "plan" > /tmp/.claude-dev-stage-$PPID

# Valid stage values (all block Write/Edit except 'implement'):
# plan, verify-plan, implement, verify-impl, compound, done

# Clear stage (disable blocking)
rm -f /tmp/.claude-dev-stage-$PPID
```

A PreToolUse hook in `.claude/hooks/hooks.json` checks this marker and blocks Write/Edit tools during non-implementation stages.

## Workflow

### Stage 1: Plan
```
[Stage 1/6: Plan]
├── Analyze requirements and constraints
├── Read existing code for context
├── Search for related patterns
├── Define approach with rationale
└── Output: Implementation plan document
```

**Exit criteria**: Clear plan with file list, approach description, and risk assessment.

### Stage 2: Verify Plan
```
[Stage 2/6: Verify Plan]
├── Review plan for completeness
├── Check for missing edge cases
├── Validate against existing patterns
├── Consider alternative approaches
└── Output: Plan approval or revision requests
```

**Exit criteria**: Plan verified by different perspective (ideally different model via multi-model-verification).

### Stage 3: Implement
```
[Stage 3/6: Implement]
├── Follow verified plan
├── Create/modify files as specified
├── Write tests alongside code
├── Track deviations from plan
└── Output: Implementation complete
```

**Exit criteria**: All planned files created/modified, tests written.

### Stage 4: Verify Implementation
```
[Stage 4/6: Verify Implementation]
├── Run test suite
├── Review code quality
├── Check for plan deviations
├── Validate error handling
└── Output: Verification report
```

**Exit criteria**: All tests pass, no critical issues found. If issues found, return to Stage 3.

### Stage 5: Compound
```
[Stage 5/6: Compound]
├── Run integration tests
├── Cross-module validation
├── Check for side effects
├── Verify documentation accuracy
└── Output: Integration report
```

**Exit criteria**: No integration issues. If issues found, return to Stage 3.

### Stage 6: Done
```
[Stage 6/6: Done]
├── Summarize changes made
├── List files modified
├── Note any deviations from plan
├── Suggest follow-up tasks
└── Output: Completion summary
```

## Integration

### With EnterPlanMode
Stage 1 (Plan) maps to Claude Code's `EnterPlanMode`. When the structured cycle is active:
- EnterPlanMode triggers Stage 1
- ExitPlanMode transitions to Stage 2 (Verify Plan), not directly to implementation

### With Multi-Model Verification
Stage 2 (Verify Plan) and Stage 4 (Verify Implementation) can invoke the `multi-model-verification` skill for comprehensive review.

### With PreToolUse Hooks
The stage marker file (`/tmp/.claude-dev-stage-$PPID`) is read by a PreToolUse hook that enforces tool restrictions. This provides a safety net beyond instruction-based compliance.

### With Agent Teams
For complex tasks, Agent Teams is **preferred** when available (R018):
- Plan: architect agent
- Verify: reviewer agent(s) — multi-model-verification via Agent Teams
- Implement: domain expert agent
- Compound: QA agent

When Agent Teams is enabled AND task involves 3+ agents or review→fix cycles, using Agent Teams is MANDATORY per R018.

## When to Use

| Task Complexity | Recommended Cycle |
|----------------|-------------------|
| Simple fix (< 3 files) | Skip — direct implementation |
| Medium feature (3-10 files) | Stages 1, 3, 4, 6 (skip verify plan, compound) |
| Complex feature (10+ files) | Full 6-stage cycle |
| Architecture change | Full 6-stage cycle with multi-model verification |
| Security-critical code | Full 6-stage cycle (mandatory) |

## Stage Transition Commands

```bash
# Orchestrator manages transitions:
echo "plan" > /tmp/.claude-dev-stage-$PPID           # Enter planning
echo "verify-plan" > /tmp/.claude-dev-stage-$PPID    # Enter plan verification
echo "implement" > /tmp/.claude-dev-stage-$PPID      # Enter implementation
echo "verify-impl" > /tmp/.claude-dev-stage-$PPID    # Enter impl verification
echo "compound" > /tmp/.claude-dev-stage-$PPID       # Enter compound testing
echo "done" > /tmp/.claude-dev-stage-$PPID           # Mark done
rm -f /tmp/.claude-dev-stage-$PPID                   # Clear (disable blocking)
```

## Limitations

- **Session scoping**: The marker path is scoped by parent PID (`/tmp/.claude-dev-stage-$PPID`), so concurrent Claude Code sessions use distinct markers and do not conflict. The reader hooks (`stage-blocker.sh`, `task-state-precompact.sh`) and the writer commands above all resolve `$PPID` to the same Claude Code process, keeping the gate consistent.
- **World-writable path**: The `/tmp/` directory is accessible to all users. The `-$PPID` suffix isolates per-session state but does not restrict filesystem permissions; avoid storing sensitive data in the marker file.

## Permission Mode

When spawning agents via the Agent tool during this skill's execution, always pass `mode: "bypassPermissions"`. The Agent tool default (`acceptEdits`) overrides agent frontmatter `permissionMode`, causing permission prompts during unattended execution.

## Display Format

```
═══ Structured Dev Cycle ═══════════════════════════
 [■■□□□□] Stage 2/6: Verify Plan
 Files planned: 5 | Risks identified: 2
═════════════════════════════════════════════════════
```

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…