Installs into .claude/skills of the current project.
Are you the author of Levn Ln 301 Task Creator?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/boisenoise-levn-ln-301-task-creator)
---
name: ln-301-task-creator
description: "Creates implementation, refactoring, and test tasks from templates. Use when an approved task plan needs tasks created in Linear and kanban."
license: MIT
---
> **Paths:** File paths (`shared/`, `references/`, `../ln-*`) are relative to skills repo root. If not found at CWD, locate this SKILL.md directory and go up one level for repo root.
# Task Creator
**Type:** L3 Worker
**Category:** 3XX Planning
Standalone-first worker for task creation. It creates tasks from an already approved plan and returns a stable summary contract.
**MANDATORY READ:** Load `shared/references/coordinator_summary_contract.md` and `shared/references/task_plan_worker_runtime_contract.md`
**MANDATORY READ:** Load `shared/references/environment_state_contract.md`, `shared/references/storage_mode_detection.md`, `shared/references/template_loading_pattern.md`, `shared/references/creation_quality_checklist.md`, and `shared/references/destructive_operation_safety.md`
## Inputs
Core inputs:
- `taskType`
- `storyData`
- `idealPlan` — task list with scopes, AC mappings, dependencies, layer classifications
- `teamId`
- `guideLinks`
Coordinator context (passed in ADD/CREATE mode):
- `traceabilityTablePath` — materialized traceability table from coordinator Phase 2
- `discoveryContext` — architecture, tech stack, key files, integration points from coordinator Phase 1
- `tasksToCreate` — specific tasks to create (ADD mode). Worker writes the 7-section document, does not decide whether tasks are needed.
Transport inputs:
- standalone: omit `runId` and `summaryArtifactPath`
- managed: pass both `runId` and `summaryArtifactPath`
## Runtime
Runtime family: `task-plan-worker-runtime`
Phase profile:
1. `PHASE_0_CONFIG`
2. `PHASE_1_LOAD_INPUTS`
3. `PHASE_2_LOAD_CONTEXT`
4. `PHASE_3_GENERATE_TASK_DOCS`
5. `PHASE_4_VALIDATE_TASKS`
6. `PHASE_5_CONFIRM_OR_AUTOAPPROVE`
7. `PHASE_6_APPLY_CREATE`
8. `PHASE_7_UPDATE_KANBAN`
9. `PHASE_8_WRITE_SUMMARY`
10. `PHASE_9_SELF_CHECK`
Summary artifact rules:
- emit `summary_kind=task-plan`
- standalone runs generate their own `run_id` and write the default worker-family artifact path
- managed runs require both `runId` and `summaryArtifactPath` and must write the summary to the exact provided path
- always write the validated summary artifact before terminal outcome
## Output Contract
Always build a structured `task-plan` summary envelope per:
- `shared/references/coordinator_summary_contract.md`
- `shared/references/task_plan_worker_runtime_contract.md`
Payload fields:
- `mode`
- `story_id`
- `task_type`
- `tasks_created`
- `tasks_updated`
- `tasks_canceled`
- `task_urls`
- `kanban_updated`
- `dry_warnings_count`
- `warnings`
Always write the validated summary before terminal outcome.
## Workflow
1. Resolve task provider and template set.
2. Run DRY and destructive-operation checks where applicable.
3. Use coordinator context (`discoveryContext`, `traceabilityTablePath`) to understand architecture. Research codebase for implementation details (existing patterns, related files, integration points) to write good Technical Approach sections.
4. Select scope:
- `ADD`: use `tasksToCreate` only
- `CREATE`: expand the full `idealPlan`
5. Generate task documents from the selected scope.
6. Validate type-specific rules.
7. Show preview and get confirmation if needed.
8. Create tasks in Linear or file mode.
9. Update kanban.
10. Return structured summary.
## Critical Rules
- Remain standalone-capable.
- Do not require coordinator runtime state.
- Keep implementation, refactoring, and test rules separated by `taskType`.
- Write machine-readable summary output every time.
- **Ideal plan is binding.** Create every task in the approved plan. Do not re-evaluate whether tasks should exist.
- **Fast path for `ADD`:** `tasksToCreate` is the execution scope. Do not re-expand the full ideal plan when the coordinator already selected the delta.
- **STOP before save_issue:** verify all 7 sections present in body: Context, Implementation Plan, Technical Approach, Acceptance Criteria, Affected Components, Existing Code Impact, Definition of Done. PreToolUse hook will BLOCK creation without them.
## Definition of Done
- [ ] Templates loaded
- [ ] Task documents generated
- [ ] Type-specific validation passed
- [ ] Tasks created in provider-specific storage
- [ ] kanban updated
- [ ] Structured summary returned
- [ ] Summary artifact written to the managed or standalone runtime path
---
**Version:** 3.0.0
**Last Updated:** 2025-12-23