Splits the project into phases that each deliver value independently, assigns scope and exit criteria to each, and produces the release plan. The phasing step — decides which requirement ships in which release.
Installs into .claude/skills of the current project.
Are you the author of Roadmap?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/bturksoy-roadmap)
---
name: roadmap
description: Splits the project into phases that each deliver value independently, assigns scope and exit criteria to each, and produces the release plan. The phasing step — decides which requirement ships in which release.
---
# /roadmap
Owner: `product-owner`, consulted: `delivery-manager`.
Outputs: `product/roadmap/ROADMAP.md` + `product/roadmap/phases/phase-N.md`
Prerequisite: `product/requirements/FRD.md`
---
## 1. Input
Extract **only the REQ heading table** from the FRD (id, title, priority, source GOAL,
dependencies). Do not embed the full requirement text — it is unnecessary for this step.
From the NFRs, take only those that affect phasing (scale, security, compliance).
## 2. Phasing principles (give these to the agent)
1. **Every phase is independently shippable and delivers value.** "Backend phase first"
is not a phase — nobody can use it.
2. **Phase 1 tests the riskiest assumption.** Pull the most uncertain thing forward,
not the easiest.
3. **Phase size:** 1-3 sprints. Split anything larger.
4. **Dependencies point forward.** Phase 2 may use Phase 1; never the reverse.
5. **Every phase has a measurable exit criterion.** Not "when it's finished", but
"when this metric reaches this value".
6. **Technical foundation work is distributed across phases**, never a separate
"infrastructure phase" — but Phase 1 must contain a **walking skeleton**.
## 3. Invoke `product-owner`
```
<REQ TABLE> + <GOAL list> + <critical NFRs> + <constraints>
Task: produce the roadmap.
1. Phases (at most 4). For each:
- Name and a one-sentence hypothesis ("If we ship this phase we will learn/enable X")
- Scope: REQ-* list
- Exit criterion: measurable (which GOAL metric, which value)
- NOT doing in this phase: list
- Walking skeleton: for Phase 1, what is the thinnest end-to-end working slice?
2. Phase dependency graph (Mermaid)
3. Release mapping: which phase maps to which version (v0.1, v1.0, ...)
4. For each phase, the biggest risk and its early-warning signal
5. Cut order: if the schedule tightens, which REQs get removed and in what order
Rule: every REQ must be assigned to exactly one phase. List any unassigned REQ and
ask "is this out of scope?".
```
## 4. Reality check with `delivery-manager` (lean+ mode)
Cannot be called in parallel (it reviews the PO's output). After the PO responds:
```
<PHASE TABLE — with scope and REQ counts>
Task: is this phasing deliverable?
1. A rough sprint estimate per phase (t-shirt: S/M/L + rationale)
2. Dependency problems: is there a chain inside a phase that waits on itself
3. Any work that cannot proceed concurrently (same file/module)
4. Critical path: which REQs shift the whole plan if delayed
5. The 3 biggest delivery risks
Be brief. Begin your reply with "DM-PLAN: APPROVED|CONDITIONAL|REJECTED".
```
Skip this step in `solo` mode.
## 5. Present
```
## Roadmap
Phase 1 — <name> (v0.1, ~<N> sprints)
Hypothesis: <...>
Scope: <N> REQs — <id list>
Exit: <measurable criterion>
Not doing: <list>
Phase 2 — ...
Unassigned REQs: <list, if any> ⚠
Delivery risk: <the DM's top 3>
Cut order: <what goes first if the schedule tightens>
```
`AskUserQuestion`: `Approve and write (Recommended)` / `I want to narrow Phase 1` /
`I want to reorder the phases`
## 6. Write
- `product/roadmap/ROADMAP.md` — top-level table + dependency graph + cut order
- `product/roadmap/phases/phase-N.md` — detail per phase
- `docs/CONTEXT.md` → update "Release target"
- `.state/project.json` → `phase: "design"`, `.state/gates.jsonl` → DM-PLAN
## 7. Close
```
✓ Roadmap: <N> phases, <M> releases
Phase 1: <name> — <K> REQs
▶ Next: /architecture
The architecture and stack will be determined for the Phase 1 scope.
```
---
## Token note
- The REQ **heading table** is embedded, not the full text. That is the biggest saving here.
- One agent call in `solo` mode; two (sequential) in `lean+`.
- The detail of later phases is **not written now** — `/requirements` and `/epics`