Installs into .claude/skills of the current project.
Are you the author of Construction Bd Skill?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/darellchua2-construction-bd-skill)
---
name: construction-bd-skill
description: >-
Construction business development knowledge — proposal summarization,
quotations with cost categories, industry terminology, Atlassian workflows.
license: Apache-2.0
compatibility: opencode
category: Startup/Business
---
# Construction Business Development Skill
## Proposal Summarization Workflow
When summarizing construction proposals, extract and organize information by the following categories:
1. **Project Overview and Objectives**
- Project type (commercial, residential, industrial, infrastructure)
- Primary goals and success criteria
- Scope of work boundaries
- Client expectations and deliverables
2. **Technical Specifications and Requirements**
- Architectural and engineering specifications
- Building codes and compliance requirements
- Quality standards and certifications (LEED, OSHA, etc.)
- Technical constraints and site conditions
3. **Material and Resource Needs**
- Primary materials (concrete, steel, lumber, fixtures, etc.)
- Equipment requirements (cranes, excavators, specialized tools)
- Labor classifications (skilled, unskilled, supervision)
- Subcontractor needs (electrical, plumbing, HVAC, MEP)
4. **Timeline and Milestones**
- Project phases and sequencing
- Critical path and dependencies
- Mobilization and demobilization schedules
- Delivery deadlines and milestone dates
5. **Stakeholders and Responsibilities**
- Client representatives
- Project managers and superintendents
- Subcontractors and vendors
- Regulatory bodies and permitting authorities
6. **Risk Factors and Mitigation Strategies**
- Site-specific risks (weather, access, soil conditions)
- Supply chain considerations
- Regulatory and permitting risks
- Safety and compliance concerns
## Quotation Preparation Workflow
### Cost Category Breakdown
When preparing construction quotations, organize costs into these standard categories:
1. **Materials**
- Raw materials (concrete, steel, lumber, aggregates)
- Finished products (windows, doors, fixtures)
- Specialized components (MEP systems, FF&E)
- Quantity takeoffs and unit pricing
2. **Labor**
- Skilled trades (carpenters, electricians, plumbers, welders)
- Unskilled labor
- Supervision (foremen, superintendents, project managers)
- Man-hour estimates by trade
3. **Equipment**
- Rental costs (cranes, excavators, scaffolding)
- Purchase costs for permanent equipment
- Fuel and maintenance
- Mobilization and demobilization fees
4. **Subcontractors**
- Electrical work
- Plumbing and mechanical
- HVAC systems
- Specialized trades (fire protection, elevators)
5. **Permits and Inspections**
- Building permits
- Environmental assessments
- Inspection fees
- Plan review costs
6. **Insurance and Bonding**
- General liability insurance
- Workers' compensation
- Performance bonds
- Bid bonds
7. **Overhead**
- Office operations
- Administrative support
- Utilities and facilities
- Project management software
8. **Markup and Profit**
- Standard markup (typically 15-25%)
- Contingency (typically 10-20%)
- Profit margin calculations
- Per Diem rates for travel
### Pricing Standards
- Use current market rates obtained via web search
- Research regional pricing variations
- Consider prevailing wage requirements
- Include appropriate unit price or lump sum structures
- Apply mobilization/demobilization costs separately
## Construction Industry Terminology
### Procurement and Bidding Terms
- **RFI (Request for Information)**: Formal request for clarification on project specifications
- **RFP (Request for Proposal)**: Detailed solicitation for vendor proposals
- **RFQ (Request for Quotation)**: Request for pricing on specific materials or services
### Contract Management Terms
- **Change Order**: Formal modification to contract scope, price, or schedule
- **Punch List**: Final list of items requiring correction before project acceptance
- **Submittal**: Formal submission of materials, samples, or drawings for approval
- **Shop Drawings**: Detailed drawings prepared by contractors showing specific installation details
- **Value Engineering**: Systematic review to reduce costs without compromising quality
### Certification and Compliance Terms
- **LEED Certification**: Leadership in Energy and Environmental Design green building certification
- **OSHA Compliance**: Occupational Safety and Health Administration safety standards
- **Prevailing Wage**: Government-mandated wage rates for public projects
### Construction Methods Terms
- **Crane Lift Plans**: Detailed engineering plans for heavy lifting operations
- **Shoring/Underpinning**: Temporary support structures for excavation or foundation work
- **MEP (Mechanical, Electrical, Plumbing)**: Building systems integration
- **HVAC (Heating, Ventilation, Air Conditioning)**: Climate control systems
- **FF&E (Furniture, Fixtures, Equipment)**: Non-permanent building components
### Delivery Methods Terms
- **Turnkey Delivery**: Contractor handles all aspects from design to completion
- **Design-Bid-Build**: Traditional sequential delivery method
- **Design-Build**: Integrated design and construction approach
- **CM at Risk (Construction Manager at Risk)**: Construction manager with guaranteed maximum price
- **GMP (Guaranteed Maximum Price)**: Fixed price contract with shared savings potential
### Pricing Structure Terms
- **Unit Price**: Price based on quantity of work (e.g., per linear foot)
- **Lump Sum**: Fixed price for entire scope of work
- **Mobilization/Demobilization**: Costs associated with bringing equipment to/from site
- **Per Diem**: Daily allowance for travel and living expenses
## Atlassian Integration Workflow
### JIRA Ticket Creation
Create JIRA tickets with the following field mapping:
1. **Basic Fields**
- Project: BD (Business Development)
- Issue Type: Task or Story
- Summary: "[Proposal/Quotation] - Client Name - Project Name"
- Description: Include comprehensive summary with:
* Document overview
* Key specifications extracted
* Cost breakdown summary
* Timeline and milestones
* Stakeholder information
- Priority: Set based on urgency and deal value
- Labels: Add relevant tags (construction, proposal, quotation, client-name)
2. **Custom Fields**
- Client Name: Text field
- Estimated Value: Currency field
- Project Type: Dropdown (commercial, residential, industrial, infrastructure)
- Due Date: Date picker
- Document Type: Dropdown (proposal, quotation, RFQ, RFP)
- Status: Dropdown (draft, submitted, under-review, awarded, lost)
3. **Attachments**
- Generated .docx files
- Generated .md files
- Original technical documents
- Supporting calculations and schedules
### Confluence Page Creation
Create Confluence pages with proper structure:
1. **Page Setup**
- Space: BD (Business Development) or client-specific space
- Title: "Client Name - Project Name - Proposal/Quotation"
- Parent Page: Organize by client or project phase
2. **Content Structure**
- Executive Summary
- Project Overview
- Technical Specifications
- Cost Breakdown Table
- Timeline and Milestones
- Stakeholder Information
- Risk Assessment
- Supporting Documents section with links
3. **Linking and Metadata**
- Link to JIRA ticket using JIRA macro
- Add appropriate labels for filtering
- Set page restrictions as needed
- Include version history for tracking changes
4. **Document Formatting**
- Use table of contents macro for navigation
- Include expand/collapse sections for detailed specifications
- Use status macros to track document state
- Add page properties macro for metadata
## Document Generation Specifications
### Word (.docx) Format Requirements
1. **Document Structure**
- Cover page with company branding
- Executive summary
- Table of contents
- Main content sections
- Appendices for technical details
- Terms and conditions
2. **Formatting Standards**
- Professional header/footer with company logo
- Consistent font styling (headings, body text)
- Proper table formatting with borders and shading
- Numbered sections and subsections
- Page numbering
3. **Content Elements**
- Professional tables for cost breakdowns
- Inserted images (plans, drawings, charts)
- Multi-level lists for specifications
- Bold emphasis for key terms and figures
- Professional terminology throughout
### Markdown (.md) Format Requirements
1. **Document Structure**
- Heading hierarchy (H1, H2, H3)
- Code blocks for technical specifications
- Tables for cost breakdowns
- List items for requirements
2. **Formatting Standards**
- Consistent heading levels
- Proper table formatting with alignment
- Links to external references
- Emphasis (bold, italic) for key points
3. **Content Elements**
- Markdown tables for itemized costs
- Code blocks for technical specifications
- Ordered lists for requirements
- Checklists for deliverables
- Links to supporting documents
## Web Search Usage for Market Rates
When researching construction pricing:
1. **Search Strategies**
- Use specific queries: "material prices [region] [year]"
- Include units: "concrete per cubic yard [city]"
- Search by trade: "electrical labor rates [state]"
- Include timeframe: "current steel prices 2026"
2. **Data Sources**
- Industry publications and databases
- Government cost indices
- Supplier price lists
- Regional contractor associations
3. **Validation Steps**
- Cross-reference multiple sources
- Verify regional applicability
- Check for recent market fluctuations
- Consider bulk vs. retail pricing
4. **Documentation**
- Note sources and dates
- Record geographic scope
- Track price trends
- Maintain pricing database
## Error Handling
### Web Search Errors
- **No pricing data found**: Document the gap and suggest manual research
- **Conflicting information**: Note discrepancies and recommend verification
- **Outdated data**: Check dates and flag for updates
- **Regional mismatch**: Specify location constraints
### JIRA Integration Errors
- **Field mapping failures**: Provide clear error messages with field names
- **Attachment size limits**: Suggest splitting documents or using cloud storage
- **Permission issues**: Recommend user authentication checks
- **API rate limits**: Suggest batching or retry with delays
- **Manual workaround**: Provide step-by-step instructions for manual ticket creation
### Confluence Integration Errors
- **Space access issues**: Verify permissions and suggest alternative spaces
- **Page title conflicts**: Recommend adding dates or unique identifiers
- **Formatting failures**: Suggest markdown-only fallback
- **Link creation errors**: Provide manual linking instructions
### Document Generation Errors
- **Word formatting issues**: Fall back to markdown-only format
- **Table rendering problems**: Use simplified table structures
- **Image insertion failures**: Provide alternative text descriptions
- **File size limits**: Compress images or split into multiple documents
### General Error Recovery
- Always preserve original technical documents
- Maintain error logs for troubleshooting
- Provide clear user-facing error messages
- Offer alternative workflows when automated steps fail
- Document manual steps as fallback procedures
- Validate data integrity before finalizing
- Maintain version control for all generated documents
## Best Practices
1. **Accuracy and Quality**
- Double-check all calculations
- Verify technical specifications against source documents
- Use current market rates and validate sources
- Maintain professional formatting and branding
2. **Consistency and Standardization**
- Use consistent terminology throughout all documents
- Follow standard construction cost categorization
- Maintain uniform document structures
- Apply consistent pricing methodologies
3. **Communication and Tracking**
- Include clear disclaimers and terms of service
- Track all documents in Atlassian systems
- Provide complete audit trails
- Maintain version history for revisions
4. **Documentation Management**
- Store all source documents for reference
- Maintain organized file naming conventions
- Keep pricing research records
- Archive completed projects appropriately
5. **Industry Compliance**
- Adhere to local building codes and regulations
- Follow safety standards (OSHA, etc.)
- Comply with prevailing wage requirements
- Include necessary permit and inspection information