Skip to content
Back to skills

Angular Upgrades Material Angular Material Mdc V15 Visual Regression Gate

ASecurity

Enforces final visual review for Angular Material v15 MDC migration before the migration can be considered complete.

  • 4 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added October 2, 2026
developmenttypescriptgoangular

Security analysis

A100/100

Scanned October 2, 2026

npx -y skills add janpereira-dev/ngAutoPilot --skill angular--upgrades--material--angular-material-mdc-v15-visual-regression-gate --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Angular Upgrades Material Angular Material Mdc V15 Visual Regression Gate?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Angular  Upgrades  Material  Angular Material Mdc V15 Visual Regression Gate
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/janpereira-dev-angular-upgrades-material-angular-material-mdc-v15-bc03858f/badge)](https://www.skillsdirectory.com/skills/janpereira-dev-angular-upgrades-material-angular-material-mdc-v15-bc03858f)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
id: angular.upgrades.material.angular-material-mdc-v15-visual-regression-gate
name: Angular Material MDC v15 Visual Regression Gate
description: >
  Enforces final visual review for Angular Material v15 MDC migration before the migration can be considered complete.
stack:
  - Angular
  - TypeScript
category: material
status: stable
version: 0.10.0
owner: NgAutoPilot
triggers:
  - Material visual regression
  - screenshot review
  - MDC final gate
compatibility:
  angular:
    min: "15"
---

# Angular Material MDC v15 Visual Regression Gate

## Purpose

Use this skill to close the Material MDC migration with an explicit visual review decision.

## When to Use

- The MDC migration slice is complete.
- The project has screenshots, smoke tests, or QA review.
- A final accept/block decision is needed.

## When Not to Use

- The MDC migration slice is not complete.
- No visual review evidence exists.

## Required Inputs

- Screenshot diffs
- Visual smoke test results
- Critical Material screens
- QA notes

## Procedure

1. Review the critical screens.
2. Compare expected and actual visual output.
3. Document accepted and rejected changes.
4. Decide whether MDC migration can close.

## Do

- Review login, forms, dialogs, tables, tabs, menus, chips, slider, and overlay-heavy screens.
- Treat unexplained visual diffs as blockers.

## Do Not

- Do not regenerate baselines without review.
- Do not close on compile success alone.

## Review Checklist

- [ ] Critical screens reviewed.
- [ ] Visual diffs explained.
- [ ] QA notes captured.
- [ ] Close/hold decision is explicit.

## Expected Output

1. Visual diff summary.
2. Accepted changes.
3. Rejected changes.
4. Final gate decision.

## Exit Criteria

- Visual review is complete.
- Final gate decision is explicit.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…