Skip to content
Back to skills

Dependency Mapping

ASecurity

Build the cross-team dependency graph and derive the critical path — every handoff gets a producer, consumer, due date, and interface contract; cycles and single points of failure get flagged. Use when a program spans multiple teams and you need to know what actually decides the date.

  • 7 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added September 23, 2026
ai-agentsnodeapi

Works with

  • api

Security analysis

A100/100

Scanned September 23, 2026

npx -y skills add mcorbett51090/RavenClaude --skill dependency-mapping --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Dependency Mapping?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Dependency Mapping
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/mcorbett51090-dependency-mapping/badge)](https://www.skillsdirectory.com/skills/mcorbett51090-dependency-mapping)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: dependency-mapping
description: "Build the cross-team dependency graph and derive the critical path — every handoff gets a producer, consumer, due date, and interface contract; cycles and single points of failure get flagged. Use when a program spans multiple teams and you need to know what actually decides the date."
---

# Skill: Dependency mapping

Make the invisible cross-team handoffs visible, then compute what actually drives
the program date. A program is its dependencies, not its tasks.

## When to use

- A program spans ≥2 teams and the date feels unknowable.
- Two teams are building toward an integration with no agreed contract.
- You need to know which slips matter (critical path) and which don't (slack).

## Procedure

1. **Enumerate cross-team deliverables.** For each, record: producer team,
   consumer team, due date, and the **interface contract** (schema / API / event /
   doc) at the seam. A handoff with no named interface is the highest-risk kind.
2. **Build the graph.** Nodes are deliverables; edges are "X must finish before Y
   can start." Use the [`dependency-map`](../../templates/dependency-map.md) template.
3. **Derive the critical path.** Find the longest chain of gated handoffs — that
   chain *is* the date. Compute **slack** on every other chain.
4. **Flag cycles** (A waits on B waits on A): break with a stub/mock or a phased
   contract. **Flag single points of failure**: one under-resourced team on the
   critical path is a key-person risk.
5. **Make every seam contract-first.** Where two teams meet, agree the interface
   *before* either builds. Route unowned seams to the TPM to assign an owner.

## Output

A dependency map, the critical path, the slack on non-critical chains, and a list
of flagged cycles/SPOFs feeding the RAID log.

## Anti-patterns

- A "dependency list" that's really a task list (no producer→consumer edges).
- A date asserted with no critical path to defend it.
- An interface seam with no owner and no contract.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…