Skip to content
Back to skills

Model Lcoe And Irr

ASecurity

Model levelized cost of energy and project IRR together, on net cost after the live incentives, since they answer different questions. Reach for this on any project-economics question.

  • 7 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added September 23, 2026
ai-agents

Security analysis

A100/100

Scanned September 23, 2026

npx -y skills add mcorbett51090/RavenClaude --skill model-lcoe-and-irr --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Model Lcoe And Irr?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Model Lcoe And Irr
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/mcorbett51090-model-lcoe-and-irr/badge)](https://www.skillsdirectory.com/skills/mcorbett51090-model-lcoe-and-irr)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: model-lcoe-and-irr
description: "Model levelized cost of energy and project IRR together, on net cost after the live incentives, since they answer different questions. Reach for this on any project-economics question."
---

# Skill: Model LCOE and project IRR

Cost-per-watt feeds both but answers neither alone.

## Step 1 — Build LCOE
Lifetime cost ÷ lifetime energy, on net cost after incentives (§3 #1, #4).

## Step 2 — Build project IRR
Levered and unlevered equity return over the hold (§3 #1).

## Step 3 — Size on P90
Use the P90 production estimate for financing, not P50 (§3 #6).

## Step 4 — Include the life
Add degradation, inverter replacement, and O&M over 25 years (§3 #5).

## Output
An LCOE, a levered/unlevered IRR on net cost, sized to P90, with the 25-year cost profile.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…