Skip to content
Back to skills

Product Launch Checklist

ASecurity

Generate a comprehensive pre-launch, launch day, and post-launch checklist for any product release. Use when preparing for a product launch, feature release, or major update. Produces a role-assigned, tiered checklist covering engineering readiness, marketing and comms, support, and post-launch monitoring.

  • 1,330 stars
  • 0 votes
  • 0 copies
  • 3 views
  • Added May 27, 2026
data-aigotestingdatabasesecurityperformance

Security analysis

A100/100

Scanned May 27, 2026

npx -y skills add mohitagw15856/pm-claude-skills --skill product-launch-checklist --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Product Launch Checklist?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Product Launch Checklist
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/mohitagw15856-product-launch-checklist/badge)](https://www.skillsdirectory.com/skills/mohitagw15856-product-launch-checklist)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: product-launch-checklist
description: "Generate a comprehensive pre-launch, launch day, and post-launch checklist for any product release. Use when preparing for a product launch, feature release, or major update. Produces a role-assigned, tiered checklist covering engineering readiness, marketing and comms, support, and post-launch monitoring."
---

# Product Launch Checklist Skill

Never launch without checking everything. Generate a complete, role-assigned checklist covering pre-launch readiness, launch day execution, and post-launch monitoring.

## How to Use This Skill

Provide:
- Launch name and date
- Launch tier (1 = major, 2 = feature, 3 = incremental)
- Team members and their roles

The skill generates a tiered checklist. Tier 3 launches use only the Essentials section. Tier 2 adds Marketing & Comms. Tier 1 uses all sections.

---

## Output Format

### Launch Checklist — [Feature/Product Name] — Target Date: [Date]

**Launch Tier:** [1 / 2 / 3]
**Launch Owner:** [PM Name]
**Engineering Lead:** [Name]
**Go/No-Go Decision By:** [Date and time — typically 24 hours before launch]

---

### 🔧 PRE-LAUNCH — Engineering & Product (T-2 weeks)
- [ ] Feature flag created and tested in staging
- [ ] All acceptance criteria signed off by PM
- [ ] Code reviewed and merged to main
- [ ] QA sign-off completed (regression + new feature)
- [ ] Performance testing completed (load, latency)
- [ ] Security review completed (if data or auth changes)
- [ ] Rollback procedure documented and tested
- [ ] Monitoring and alerting configured
- [ ] Error logging in place with correct severity levels
- [ ] Database migrations tested on staging with production data volume

### 📢 PRE-LAUNCH — Marketing & Comms (T-1 week)
- [ ] Blog post written, reviewed, and scheduled
- [ ] In-app announcement or tooltip configured
- [ ] Email campaign drafted and QA'd
- [ ] Social media posts drafted and scheduled
- [ ] Landing page or feature page live in staging
- [ ] Press outreach sent (Tier 1 only)
- [ ] Product Hunt / community posts prepared (Tier 1 only)

### 🎓 PRE-LAUNCH — Sales & Support (T-1 week)
- [ ] Sales enablement one-pager completed
- [ ] FAQ document shared with sales and support teams
- [ ] Help centre articles written and published
- [ ] Support team demo / training completed
- [ ] Customer success team briefed on top accounts
- [ ] Pricing updated (if applicable)
- [ ] Contracts / ToS updated (if applicable)

### 📊 PRE-LAUNCH — Analytics (T-1 week)
- [ ] Analytics events firing correctly in staging
- [ ] Dashboard configured for launch metrics
- [ ] Baseline metrics documented
- [ ] Success criteria documented and shared with team
- [ ] A/B test configured (if applicable)

---

### ✅ GO / NO-GO DECISION — T-24 hours

| Criteria | Status | Owner |
|---|---|---|
| All critical bugs resolved | 🟢 / 🔴 | Eng Lead |
| QA sign-off complete | 🟢 / 🔴 | QA |
| Rollback tested | 🟢 / 🔴 | Eng Lead |
| Help centre articles live | 🟢 / 🔴 | Support |
| Monitoring active | 🟢 / 🔴 | Eng Lead |
| PM sign-off | 🟢 / 🔴 | PM |

**Go / No-Go Decision:** [GO / NO-GO]
**Decision Owner:** [PM + Eng Lead jointly]

---

### 🚀 LAUNCH DAY
- [ ] Feature flag enabled for [X%] of users (start low — 5–10%)
- [ ] Launch confirmed in team Slack/channel
- [ ] Metrics dashboard open and being monitored
- [ ] Error rate checked at T+15 min, T+1 hr, T+4 hr
- [ ] Blog post published / email sent
- [ ] Social posts live
- [ ] Support team on standby for first 4 hours
- [ ] PM available and reachable all day
- [ ] Feature flag expanded to 50% if T+2hr checks pass
- [ ] Feature flag expanded to 100% if T+4hr checks pass

---

### 📈 POST-LAUNCH (D+7, D+30)
- [ ] D+7 metrics review: adoption, errors, support tickets
- [ ] D+7 customer feedback synthesised
- [ ] Retrospective scheduled
- [ ] Learnings documented
- [ ] D+30 success metrics reviewed against targets
- [ ] Feature flag removed from codebase (clean up)
- [ ] Follow-up features added to backlog based on feedback

---

## Quality Checks

- [ ] Launch tier confirmed before generating checklist (scope determines depth)
- [ ] Go/No-Go decision has a named owner and a specific decision time
- [ ] Rollback procedure is documented and tested (not just planned)
- [ ] Feature flag expansion is staged (5% → 50% → 100%), not all-at-once
- [ ] Post-launch retrospective is scheduled at launch time

## Guidelines

- The Go/No-Go decision must have a named owner — "the team" is not an owner
- Never launch on a Friday unless you have weekend engineering coverage
- Recommend starting all launches at <10% traffic — even for simple features
- Document rollback time: "We can revert this in X minutes" should be known before launch

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…