Skip to content
Back to skills

Asset Maintenance Priority

ASecurity

Prioritize maintenance work by safety and customer impact, using their defect list. Use when the user mentions maintenance priority, work order triage, asset backlog, utility maintenance, or asks for a maintenance priority. Energy and utilities operations skill by Yasir Jilani.

  • 2 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added September 30, 2026
ai-agentspythonawsgitapi

Works with

  • cli
  • api

Security analysis

A100/100

Scanned September 30, 2026

npx -y skills add SYasJ/claude-business-skills --skill asset-maintenance-priority --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Asset Maintenance Priority?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Asset Maintenance Priority
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/syasj-asset-maintenance-priority/badge)](https://www.skillsdirectory.com/skills/syasj-asset-maintenance-priority)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: asset-maintenance-priority
description: "Prioritize maintenance work by safety and customer impact, using their defect list. Use when the user mentions maintenance priority, work order triage, asset backlog, utility maintenance, or asks for a maintenance priority. Energy and utilities operations skill by Yasir Jilani."
license: MIT
compatibility: Agent Skills standard. No network access, extra packages, or credentials required.
metadata:
  author: Yasir Jilani
  version: "1.0.0"
  domain: energy
---

<!-- GENERATED FILE - edits here are overwritten by scripts/generate.py.
     Edit the 'asset-maintenance-priority' entry in source/, then run:
       python3 scripts/generate.py && python3 scripts/validate.py
     See CONTRIBUTING.md. -->

# Maintenance Priority

Prioritize maintenance work by safety and customer impact, using their defect list.

## When to use this skill

Use this skill when the user:

- maintenance priority
- work order triage
- asset backlog
- utility maintenance

## When not to use this skill

- The user wants a different domain's specialist skill.
- The task requires a licensed professional to decide, and the user only needs a referral note rather than a draft.
- The request asks you to deceive, evade a control, or hide material facts.

## Professional boundary

Operational energy advice is not a permit and not a safety case. Do not bypass lockout, isolation, or regulatory limits.

## Operating boundaries

- Use only information the user provides or files they explicitly ask you to read. Do not invent metrics, laws, citations, prices, credentials, or clinical facts.
- Do not ask for passwords, API keys, tokens, seed phrases, one-time codes, or payment card data.
- Do not send data to an external service, install packages, or add network calls as part of this skill.
- Separate facts, assumptions, and recommendations. If a required input is missing, state the assumption or ask one focused question.
- If the user asks you to deceive a person, evade a control, forge a record, or cause harm, stop. Offer a legitimate alternative.
- Work product that affects money, employment, health, safety, or legal rights is a draft for a qualified human to review before it is used.

## Inputs to collect

- The defect list
- Safety flags
- Customer impact
- Crew capacity

## Workflow


### 1. Step 1

Put safety defects they flagged first.
### 2. Step 2

Then customer-impacting defects.
### 3. Step 3

Capacity-cut the rest visibly.
### 4. Step 4

Do not defer a known safety defect to make a metric look better.
### 5. Step 5

Assign an owner and a date to the kept work.
### 6. Step 6

Note what information is missing before a crew is sent.

## Output

Deliver a **maintenance priority**.

- Purpose of this maintenance priority, in two sentences.
- Facts the user supplied, listed separately from assumptions.
- The work itself, in the structure the workflow names.
- Open questions, risks, and the single next action with an owner.
- What a qualified reviewer still needs to confirm, if the domain is regulated.

## Quality bar

- Every number, date, name, and citation came from the user or is marked as an assumption.
- The artifact can be used without reading this skill again.
- Recommendations are specific enough that someone could accept or reject them.
- Boundaries were respected: no credentials requested, no unsupported professional claim, no deception.

## Example

### Scenario

Devon Hale, operations superintendent at Prairie Line Energy in Grande Prairie, needs a maintenance priority by 30 September 2026. A cosmetic backlog is scheduled ahead of a known leak on a safety device.

### Example data

```text
From: Devon Hale, operations superintendent
Organization: Prairie Line Energy, Grande Prairie
Date: 14 September 2026
Needed by: 30 September 2026

A cosmetic backlog is scheduled ahead of a known leak on a safety device.

The defect list: Feeder 12; Site meter 4; September bill
Safety flags: September bill. Partly documented: the what is written down, the who is not
Customer impact: Redline Parts
Crew capacity: two people, no overtime figure
```

### Example outcome

**Maintenance priority**
To: Devon Hale, operations superintendent, Prairie Line Energy
Date: 14 September 2026 · Needed by: 30 September 2026

**Decision**
Puts the safety device first and parks cosmetics over capacity.

**What the file supports**

| Input | Value | Status |
| --- | --- | --- |
| The defect list | Feeder 12; Site meter 4; September bill | Needs confirmation |
| Safety flags | September bill. Partly documented: the what is written down, the who is not | Carried into the draft |
| Customer impact | Redline Parts | Carried into the draft |
| Crew capacity | two people, no overtime figure | Needs confirmation |

**How this draft was built**

**1. Put safety defects they flagged first**

**2. Then customer-impacting defects**

**3. Capacity-cut the rest visibly**

**4. Do not defer a known safety defect to make a metric look better**

**5. Assign an owner and a date to the kept work**

**Deliberately not done**
- Deferring a known safety defect for a metric.
- No capacity cut.
- A crew sent with no location.

**Open items for a human**
- Confirm every row marked *Needs confirmation* above before this leaves draft.
- Anything absent from the file stayed absent. No figure, date, or name was supplied from outside it.

Next: Devon Hale by 30 September 2026. This is a draft, not a sign-off.

## Anti-patterns

- Deferring a known safety defect for a metric
- No capacity cut
- A crew sent with no location

## Related skills

- `portfolio-prioritization`
- `capacity-plan`

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…