Back to skills
SKILL.md
Design Compliance Architecture Pjt222
ASecurityDesign a compliance architecture that maps applicable regulations to computerized systems. Covers system inventory, criticality classification (GxP-critical, GxP-supporting, non-GxP), GAMP 5 category assignment, regulatory requirements traceability, and governance structure definition. Use when establishing a new regulated facility, formalising compliance across multiple systems, addressing a regulatory gap analysis, harmonising compliance after mergers or reorganisations, or preparing a site...
- 67 stars
- 0 votes
- 0 copies
- 2 views
- Added September 6, 2026
Works with
Security analysis
100/100npx -y skills add ThomasMoreAI/legal-skills-open --skill design-compliance-architecture-pjt222 --agent claude-codeAre you the author of Design Compliance Architecture Pjt222?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/thomasmoreai-design-compliance-architecture-pjt222-legal-skills-open)---
name: design-compliance-architecture-pjt222
title: 設合規架構
description: Design a compliance architecture that maps applicable regulations to computerized systems. Covers system inventory, criticality classification (GxP-critical, GxP-supporting, non-GxP), GAMP 5 category assignment, regulatory requirements traceability, and governance structure definition. Use when establishing a new regulated facility, formalising compliance across multiple systems, addressing a regulatory gap analysis, harmonising compliance after mergers or reorganisations, or preparing a site master file that references computerized systems.
author: pjt222
author_url: https://github.com/pjt222/agent-almanac/tree/main/i18n/wenyan/skills/design-compliance-architecture
license: MIT
version: 0.1.0
execution_mode: open
jurisdiction: general
practice: life-sciences
language: zh
---
# 設合規架構
立頂層合規框,映法規至系統、分要度、定受管境之治理。
## 用時
- 新受管之設施、部門或項目立
- 既有組織需跨諸系正其合規態
- 合規差析揭系統分類或驗策之缺
- 併購或重組需跨實體統合規
- 備場主文件或質手冊引諸計算系統
## 入
- **必要**:在範計算系統之單(名、用、供/自造)
- **必要**:適法規框(21 CFR Part 11、EU Annex 11、GMP、GLP、GCP、ICH Q7、ICH Q10)
- **必要**:組境(部、場、品類)
- **可選**:既有之驗主計或質手冊
- **可選**:前審發或法規察
- **可選**:附質與 IT 報告線之組圖
## 法
### 第一步:建系統清冊
建全面之計算系統清冊:
```markdown
# System Inventory
## Document ID: SI-[SITE]-[YYYY]-[NNN]
| ID | System Name | Version | Vendor | Purpose | Department | Data Types | Users |
|----|-------------|---------|--------|---------|------------|------------|-------|
| SYS-001 | LabWare LIMS | 8.1 | LabWare Inc. | Sample management and testing | QC | Test results, COA | 45 |
| SYS-002 | SAP ERP | S/4HANA | SAP SE | Batch release and inventory | Production | Batch records, BOM | 120 |
| SYS-003 | Custom R/Shiny | 2.1.0 | Internal | Statistical analysis | Biostatistics | Clinical data | 8 |
| SYS-004 | Windows Server | 2022 | Microsoft | File server | IT | Documents | 200 |
```
**得:** 建、改、存、取、傳 GxP 相關數據之諸系統皆列。
**敗則:** 若系統主不能供全資,錄缺而排發現會。缺系統為關鍵合規險。
### 第二步:分系統要度
各系統賦要度層:
```markdown
# System Criticality Classification
## Document ID: SCC-[SITE]-[YYYY]-[NNN]
### Classification Criteria
| Tier | Definition | Validation Required | Examples |
|------|-----------|-------------------|----------|
| **GxP-Critical** | Directly impacts product quality, patient safety, or data integrity. Generates or processes GxP records. | Full CSV per GAMP 5 | LIMS, ERP (batch), CDMS, MES |
| **GxP-Supporting** | Supports GxP processes but does not directly generate GxP records. Failure has indirect impact. | Risk-based qualification | Email, document management, scheduling |
| **Non-GxP** | No impact on product quality, safety, or data integrity. | IT standard controls only | HR systems, cafeteria, general web |
### System Classification Matrix
| System ID | System | Tier | Rationale |
|-----------|--------|------|-----------|
| SYS-001 | LabWare LIMS | GxP-Critical | Generates test results used for batch release |
| SYS-002 | SAP ERP | GxP-Critical | Manages batch records and material traceability |
| SYS-003 | R/Shiny App | GxP-Critical | Performs statistical analysis for regulatory submissions |
| SYS-004 | Windows Server | GxP-Supporting | Stores controlled documents but does not generate GxP data |
```
**得:** 各系統有層賦並記由。
**敗則:** 若系統要度有爭,升至質委。疑則分高一層,正險析後重評。
### 第三步:賦 GAMP 5 軟類
為各 GxP-Critical 與 GxP-Supporting 系統賦 GAMP 5 類:
```markdown
# GAMP 5 Category Assignment
| System ID | System | GAMP Category | Rationale | Validation Effort |
|-----------|--------|---------------|-----------|-------------------|
| SYS-001 | LabWare LIMS | 4 — Configured Product | COTS with extensive workflow configuration | Medium-High |
| SYS-002 | SAP ERP | 4 — Configured Product | COTS with custom transactions | Medium-High |
| SYS-003 | R/Shiny App | 5 — Custom Application | Internally developed | High — Full lifecycle |
| SYS-004 | Windows Server | 1 — Infrastructure | Operating system, no custom configuration | Low — Verify installation |
```
類參:
- **Category 1**:基礎設施(OS、固件)——驗裝
- **Category 3**:未配 COTS——驗功能如是
- **Category 4**:已配產品——驗諸配
- **Category 5**:自造應用——全生命驗
**得:** 類賦合系統實用,非唯其性。
**敗則:** 若系統跨類(如 COTS 附自加),自加部分類為 Category 5,基為 Category 4。
### 第四步:映法規至系統
建法規可溯矩陣:
```markdown
# Regulatory Requirements Traceability Matrix
## Document ID: RRTM-[SITE]-[YYYY]-[NNN]
| Regulation | Clause | Requirement | Applicable Systems | Control Type |
|-----------|--------|-------------|-------------------|--------------|
| 21 CFR 11 | 11.10(a) | Validation | SYS-001, SYS-002, SYS-003 | Procedural + Technical |
| 21 CFR 11 | 11.10(d) | Access controls | SYS-001, SYS-002, SYS-003, SYS-004 | Technical |
| 21 CFR 11 | 11.10(e) | Audit trail | SYS-001, SYS-002, SYS-003 | Technical |
| 21 CFR 11 | 11.50 | Signature manifestation | SYS-001, SYS-002 | Technical |
| EU Annex 11 | §4 | Validation | SYS-001, SYS-002, SYS-003 | Procedural + Technical |
| EU Annex 11 | §7 | Data storage and backup | All | Technical |
| EU Annex 11 | §9 | Audit trail | SYS-001, SYS-002, SYS-003 | Technical |
| EU Annex 11 | §12 | Security and access | All | Technical |
| ICH Q10 | §3.2 | Change management | All GxP-Critical | Procedural |
| ICH Q10 | §1.8 | Knowledge management | SYS-001, SYS-003 | Procedural |
```
**得:** 諸適法規款映至少一系統,諸 GxP-Critical 系統映相關款。
**敗則:** 未映款為合規缺。為各缺建修計附時限。
### 第五步:定各系統驗策
依要度、類、法規映:
```markdown
# Validation Strategy Summary
| System | Category | Criticality | Validation Approach | Key Deliverables |
|--------|----------|------------|--------------------|--------------------|
| LabWare LIMS | 4 | Critical | Prospective CSV | URS, RA, VP, IQ, OQ, PQ, TM, VSR |
| SAP ERP | 4 | Critical | Prospective CSV | URS, RA, VP, IQ, OQ, TM, VSR |
| R/Shiny App | 5 | Critical | Prospective CSV + code review | URS, RA, VP, IQ, OQ, PQ, TM, VSR, code audit |
| Windows Server | 1 | Supporting | Installation qualification | IQ checklist |
```
簡:URS(用者要求)、RA(險評)、VP(驗計)、IQ/OQ/PQ(裝/運/性能合格)、TM(可溯矩陣)、VSR(驗總結報)。
**得:** 驗力比險——Category 5 GxP-Critical 系統全生命;Category 1 基礎設施簡 IQ。
**敗則:** 若關者欲減關鍵系統之驗,以 QA 簽錄險受。
### 第六步:設治理結構
定持續合規之組框:
```markdown
# Compliance Governance Structure
## Roles and Responsibilities
| Role | Responsibility | Authority |
|------|---------------|-----------|
| Quality Director | Overall compliance accountability | Approve validation strategies, accept risks |
| System Owner | Day-to-day system compliance | Approve changes, ensure validated state |
| Validation Lead | Plan and coordinate validation activities | Define validation scope and approach |
| IT Operations | Technical infrastructure and security | Implement technical controls |
| QA Reviewer | Independent review of validation deliverables | Accept or reject validation evidence |
## Governance Committees
| Committee | Frequency | Purpose | Members |
|-----------|-----------|---------|---------|
| Change Control Board | Weekly | Review and approve system changes | System owners, QA, IT, validation |
| Periodic Review Committee | Quarterly | Review system compliance status | Quality director, system owners, QA |
| Audit Programme Committee | Annual | Plan internal audit schedule | Quality director, lead auditor, QA |
## Escalation Matrix
| Issue | First Escalation | Second Escalation | Timeline |
|-------|-----------------|-------------------|----------|
| Critical audit finding | System Owner → QA Director | QA Director → Site Director | 24 hours |
| Validated state breach | Validation Lead → System Owner | System Owner → Quality Director | 48 hours |
| Data integrity incident | System Owner → QA Director | QA Director → Regulatory Affairs | 24 hours |
```
**得:** 諸合規活有清責無孤責。
**敗則:** 若責疊或未賦,集 RACI 會以解。責歧為常法規引。
### 第七步:匯合規架構文件
合諸件為主文件:
```markdown
# Compliance Architecture
## Document ID: CA-[SITE]-[YYYY]-[NNN]
## Version: 1.0
### 1. Purpose and Scope
[Organisation, site, product scope, regulatory scope]
### 2. System Inventory
[From Step 1]
### 3. Criticality Classification
[From Step 2]
### 4. GAMP 5 Category Assignments
[From Step 3]
### 5. Regulatory Requirements Traceability
[From Step 4]
### 6. Validation Strategy
[From Step 5]
### 7. Governance Structure
[From Step 6]
### 8. Periodic Review Schedule
- System inventory refresh: Annual
- Criticality re-assessment: When new systems added or regulations change
- Regulatory mapping update: When new guidance issued
- Governance review: Annual or after organisational change
### 9. Approval
| Role | Name | Signature | Date |
|------|------|-----------|------|
| Quality Director | | | |
| IT Director | | | |
| Regulatory Affairs | | | |
```
**得:** 單一文為全受管境之合規藍圖。
**敗則:** 若文超實用大小,建主文件附按系或域之從屬文件。
## 驗
- [ ] 系統清冊含諸理 GxP 數據之系
- [ ] 各系統有要度層並記由
- [ ] GAMP 5 類賦諸 GxP-Critical 與 GxP-Supporting 系
- [ ] 法規可溯矩陣覆諸適款
- [ ] 諸 GxP-Critical 系統有定驗策
- [ ] 治理結構定責、委、升階線
- [ ] 諸文有唯一 ID 與版控
- [ ] 合規架構文經質與 IT 領導准
## 陷
- **清冊不全**:缺系統於合規為隱。用網掃、軟資產理具、部問——非唯問 IT。
- **二元思**:系統非唯「GxP」或「非 GxP」。三層模(關鍵、支持、非 GxP)避過驗與欠驗。
- **類惑**:GAMP 5 類述軟件是何,然驗力宜反如何用。用於批放之 Category 4 需測多於用於排程之 Category 4。
- **靜架構**:合規架構為活文件。新系、法規變、審發皆需更。
- **治理無牙**:紙上委從不集則合規無值。定會頻與定足。
## Related Skills
- `perform-csv-assessment` — 為個系統執此所定之驗策
- `manage-change-control` — 運治理中定之變控程
- `implement-electronic-signatures` — 實法規矩陣映之電簽控
- `prepare-inspection-readiness` — 以此架構為察備基
- `conduct-gxp-audit` — 以合規架構為基線審
Attribution
Comments
Loading comments…