Skip to content
Back to skills

Estimate

ASecurity

Produces time and complexity estimates for features, tasks, or sprints using story points, t-shirt sizing, or day estimates. Use when the user asks for an estimate, wants to size a feature, or mentions estimation or planning poker.

  • 71 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added May 27, 2026
data-aigotestingperformance

Security analysis

A100/100

Scanned May 27, 2026

npx -y skills add tranhieutt/software_development_department --skill estimate --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Estimate?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Estimate
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/tranhieutt-estimate/badge)](https://www.skillsdirectory.com/skills/tranhieutt-estimate)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: estimate
type: workflow
description: "Produces time and complexity estimates for features, tasks, or sprints using story points, t-shirt sizing, or day estimates. Use when the user asks for an estimate, wants to size a feature, or mentions estimation or planning poker."
argument-hint: "[task-description]"
user-invocable: true
allowed-tools: Read, Glob, Grep
effort: 1
when_to_use: "When estimating task effort, complexity, or duration for planning purposes"
---

When this skill is invoked:

1. **Read the task description** from the argument. If the description is too
   vague to estimate meaningfully, ask for clarification before proceeding.

2. **Read CLAUDE.md** for project context: tech stack, coding standards,
   architectural patterns, and any estimation guidelines.

3. **Read relevant design documents** from `design/docs/` if the task relates
   to a documented feature or system.

4. **Scan the codebase** to understand the systems affected by this task:
   - Identify files and modules that would need to change
   - Assess the complexity of those files (size, dependency count, cyclomatic
     complexity)
   - Identify integration points with other systems
   - Check for existing test coverage in the affected areas

5. **Read past sprint data** from `production/sprints/` if available:
   - Look for similar completed tasks and their actual effort
   - Calculate historical velocity (planned vs actual)
   - Identify any estimation bias patterns (consistently over or under)

6. **Analyze the following factors**:

   **Code Complexity**:
   - Lines of code in affected files
   - Number of dependencies and coupling level
   - Whether this touches core/engine code vs leaf/feature code
   - Whether existing patterns can be followed or new patterns are needed

   **Scope**:
   - Number of systems touched
   - New code vs modification of existing code
   - Amount of new test coverage required
   - Data migration or configuration changes needed

   **Risk**:
   - New technology or unfamiliar libraries
   - Unclear or ambiguous requirements
   - Dependencies on unfinished work
   - Cross-system integration complexity
   - Performance sensitivity

7. **Generate the estimate**:

```markdown
## Task Estimate: [Task Name]
Generated: [Date]

### Task Description
[Restate the task clearly in 1-2 sentences]

### Complexity Assessment

| Factor | Assessment | Notes |
|--------|-----------|-------|
| Systems affected | [List] | [Core, business, UI, etc.] |
| Files likely modified | [Count] | [Key files listed below] |
| New code vs modification | [Ratio, e.g., 70% new / 30% modification] | |
| Integration points | [Count] | [Which systems interact] |
| Test coverage needed | [Low / Medium / High] | [Unit, integration, manual] |
| Existing patterns available | [Yes / Partial / No] | [Can follow existing code or new ground] |

**Key files likely affected:**
- `[path/to/file1]` -- [what changes here]
- `[path/to/file2]` -- [what changes here]
- `[path/to/file3]` -- [what changes here]

### Effort Estimate

| Scenario | Days | Assumption |
|----------|------|------------|
| Optimistic | [X] | Everything goes right, no surprises, requirements are clear |
| Expected | [Y] | Normal pace, minor issues, one round of review feedback |
| Pessimistic | [Z] | Significant unknowns surface, blocked for a day, requirements change |

**Recommended budget: [Y days]**

[If historical data is available: "Based on [N] similar tasks that averaged
[X] days actual vs [Y] days estimated, a [correction factor] adjustment has
been applied."]

### Confidence: [High / Medium / Low]

**High** -- Clear requirements, familiar systems, follows existing patterns,
similar tasks completed before.

**Medium** -- Some unknowns, touches moderately complex systems, partial
precedent from previous work.

**Low** -- Significant unknowns, new technology, unclear requirements, or
cross-cutting concerns across many systems.

[Explain which factors drive the confidence level for this specific task.]

### Risk Factors

| Risk | Likelihood | Impact | Mitigation |
|------|-----------|--------|------------|
| [Specific risk] | [High/Med/Low] | [Days added if realized] | [How to reduce] |
| [Another risk] | [Likelihood] | [Impact] | [Mitigation] |

### Dependencies

| Dependency | Status | Impact if Delayed |
|-----------|--------|-------------------|
| [What must be done first] | [Done / In Progress / Not Started] | [How it affects this task] |

### Suggested Breakdown

| # | Sub-task | Estimate | Notes |
|---|----------|----------|-------|
| 1 | [Research / spike] | [X days] | [If unknowns need investigation first] |
| 2 | [Core implementation] | [X days] | [The main work] |
| 3 | [Integration with system X] | [X days] | [Connecting to existing code] |
| 4 | [Testing and validation] | [X days] | [Writing tests, manual verification] |
| 5 | [Code review and iteration] | [X days] | [Review feedback, fixes] |
| | **Total** | **[Y days]** | |

### Historical Comparison
[If similar tasks exist in sprint history:]

| Similar Task | Estimated | Actual | Relevant Difference |
|-------------|-----------|--------|-------------------|
| [Past task 1] | [X days] | [Y days] | [What makes it similar/different] |
| [Past task 2] | [X days] | [Y days] | [What makes it similar/different] |

### Notes and Assumptions
- [Key assumption that affects the estimate]
- [Another assumption]
- [Any caveats about scope boundaries -- what is included vs excluded]
- [Recommendations: e.g., "Consider a spike first if requirement X is unclear"]
```

8. **Output the estimate** to the user with a brief summary: recommended
   budget, confidence level, and the single biggest risk factor.

### Guidelines

- Always give a range (optimistic / expected / pessimistic), never a single
  number. Single-point estimates create false precision.
- The recommended budget should be the expected estimate, not the optimistic
  one. Padding is not dishonest -- it is realistic.
- If confidence is Low, recommend a time-boxed spike or prototype before
  committing to the full estimate.
- Be explicit about what is included and excluded. Scope ambiguity is the
  most common source of estimation error.
- Round to half-day increments. Estimating in hours implies false precision
  for tasks longer than a day.
- If the task is too large to estimate confidently (more than 10 days
  expected), recommend breaking it into smaller tasks and estimating those
  individually.
- Do not pad estimates silently. If risk exists, call it out explicitly in
  the risk factors section so the team can decide how to handle it.

## Protocol

- **Question**: Reads task description from argument; asks for clarification if scope is too vague to estimate
- **Options**: Skip — single analysis path
- **Decision**: Skip — estimate is advisory
- **Draft**: Full estimate shown in conversation only
- **Approval**: Skip — read-only; no files written

## Output

Deliver exactly:

- **Estimate**: X days (rounded to half-day increments)
- **Confidence**: High / Medium / Low with one-sentence reason
- **Risk factors**: explicit list — no silent padding
- **Recommendation**: proceed / run a spike first / break into smaller tasks

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…